GAS PIPELINE FROM MATHIAS WV TO STANDARDSVILLE, VA
SHEN ACCESS N
SHEN ACCESS S
pipelineee
DRIP REMOVAL
STATION UPGRADE (Estimated Wild Guess 14000 tons between 1/4" and 57s)
ACCESS RD (Access Road-1/4 mile long, RDC and 1/4")
ACCESS ROAD (Access Raod with RDC, 1/4" and 57s to top off.)
NEW LINE (Adding a new line for Chicken Houses. Needs Access as well as 1/4")
ACCESS RD (Access Road with RDC, work pad with RDC and 1/4". Access Road 1/4 Mile.)
PAD (not much stone)
WATER CROSSING
WATER CROSSING
ACCESS RD (Access Road and Work Pad.)
ACCESS ROAD (Access Road along with some Padding, will take some 57s as well.)
SHENANDOAH RIVER ("A shit load of stone" will need to dam half of the river while they work on the pipeline.)
LAYDOWN AREA 3AC (3 Acres set aside for a laydown area-3" and 57s.)
PAD (This section has a steep hill as well as padding needed. RIP? Can't they use Grove Hill Church Rd? Notes say they will access at Billy Hammers Chicken Houses.)
PAD (Coors Tap, needs a pad as well as 57s.)
ACCESS ROAD (Access road and a work pad, will need 57s to cover back. ONE OTHER LOCATION UNKNOWN IN HENSLEY HOLLOW.)
ACCESS ROAD (1/4 mile access road up hill from Pottery store. Noted as "Lydia" at the bottom of the mountain.)
PAD (Blow off area with a work pad needed. They will also need an access road.)
BRICKERS STATION (This will be expanding as well to include a "shit load" of stone.)