14.783m
20.117m
91.44m
.
Approach End Overrun
Departure End Overrun
Clear Zone
Clear Zone
Shoulder
Shoulder
3500' by 100' LZ with 35' clear zone and 10' shoulder on either side
300' overrun
300' overrun

5.5mi
2060
1853
AUX VI LZ RWY 19 Approach end 12S UB 30021 40606
AUX VI LZ Centerpoint 12S UB 29809 40117 (AUX VI RWY 01/19 centerpoint)
AUX VI LZ RWY 19 Departure end 12S UB 29587 39643
Proposed 650' solar tower location
FARP Tanker Nose
Tanker SPR
Single Point FARP point
Proposed CFR/Fire Truck position
1853
2681